Infrastructure
The larger of the two facilities (SRFs) of Arya Steel, SASPL – Yard No. 5 is also one of the largest facilities in the world in size and capacity.
Yard Infrastructure
The company operates 2 major yards at Alang with a consolidated capacity of 1,40,000 MT annually.
Impermeable floor
100% ground coverage
Oily block cleaning zone
Equipped for complete decontamination
Oily machinery zone
Dedicated zone for oil removal
Rain/storm water drain
Collection system with sedimentation tank
Coming Soon
Coming Soon
Dedicated cutting zone
Controlled hot-works environment
Jetty
95 mtr. jetty with storm water collection drain
Finished goods zone
Coming Soon
Backup Generator
375 kVA auto start generator
Solar
Coming Soon
Non-ferrous zone
Coming Soon
HSEQ facilities
The company operates 2 major yards at Alang with a consolidated capacity of 1,40,000 MT annually.
HSEQ control center
Centralised monitoring and control center
Visitor checkpoint
Coming Soon
Safety office
HSEQ Manager's office
PPE Stores
Well stocked PPE stores
Training room
Fully equipped 75 seater training room
Accommodation - HSEQ
Coming Soon
Owners rep. office
Coming Soon
Rep. accommodation
Coming Soon
Emergency response infrastructure
The company operates 2 major yards at Alang with a consolidated capacity of 1,40,000 MT annually.
First aid room
Caption
Rescue boat
Caption
Muster point
Assembly area for 150 persons
Emer. escape route
Well marked escape routes
Colour coded as per international standards
Designed as per international guidelines
Firefighting systems
Manned fire station
Sand buckets
Regular inspections
Fire hydrants
Portable fire extinguishers
Satellite fire stations
Hazmat management
The company operates 2 major yards at Alang with a consolidated capacity of 1,40,000 MT annually.
Paint, oil, grease stores
Stores with MSDS data
Hazardous waste stores
Dedicated and segregated hazmat stores
Packaging and storage of hazmat
Workers facilities
The company operates 2 major yards at Alang with a consolidated capacity of 1,40,000 MT annually.
At the dormitory
Laundry
Coming Soon
Kitchen facilities
Coming Soon
Mess
Coming Soon
Recreational area
Coming Soon
Acommodation
Coming Soon
Coming Soon
At the yard
Rest area
Rest area for breaks
Locker room
Change room with lockers
Drinking water
RO water facility
Shower & Washroom
Well kept showers
Hygenic toilets
Hygenic toilets
Machinery
The company operates 2 major yards at Alang with a consolidated capacity of 1,40,000 MT annually.
Cranes
Clark Lima - 61 Tons SWL
Manitow 4000W - 60.4 Tons SWL
RB 30 B - 17 Tons SWL
HM 93 - 33 Tons SWL
HM 101 - 52 Tons SWL
RB 30 HD - 17 Tons SWL
Winches
Winch 1 - 100 Tons SWL
Winch 2 - 100 Tons SWL
Winch 3 - 100 Tons SWL
Winch 4 - 100 Tons SWL
Winch 5 - 100 Tons SWL
Winch 6 - 100 Tons SWL
Dumpers
3 dumpers
Excavators
Coming Soon
Weighbridge
100 Ton capacity weigh bridge
Process gas infrastructure
The company operates 2 major yards at Alang with a consolidated capacity of 1,40,000 MT annually.
Centralized oxygen
13,017 kgs capacity
Piped PNG
Coming Soon
LPG stores
Secure LPG storage
Distribution system
Underground gas distribution system
Underground gas distribution system
Coming Soon
Admin & Ops
The company operates 2 major yards at Alang with a consolidated capacity of 1,40,000 MT annually.
Admin Building
Coming Soon
Conference rooms
Coming Soon
Accounting department
Coming Soon
Maintenance infrastructure
The company operates 2 major yards at Alang with a consolidated capacity of 1,40,000 MT annually.
Workshop
Fully equipped for quick repairs
Manned by trained technicians
Gas Torch Maintenance
In-house torch maintenance workshop